Traffic signal installation at Route 110 and Hwy 21 almost ready to start

(DeSoto) The scheduled traffic signal at Route 110 and Highway 21 near DeSoto is close to starting up. MoDOT Area Engineer Stephen O’Connor says they are about to begin the preliminary construction.

O’Connor says this signal has been needed for some time, as there have been several accidents over the years.

The installation of the traffic signals at Route 110 and Highway 21, along with adding the needed turn lanes should be completed sometime in early 2022.

Newsletter